Quencher 2015 Re-Build

The existing coke quenching station was installed some 45 years ago, and required a major rebuild to allow it to be operational into the future.

PEA’s roll was to produce drawings and documentation to allow the manufacture of replacement components, and also to allow the in situ refurbishment of existing components.

Part of the scope of work was to audit existing drawings, some dating back to the original installation and revise these to be a true and accurate representation of site.